Drawing on extensive experience across commercial diving, marine construction, and emergency response, our team applies proven methodologies and technical expertise to safely and efficiently manage every stage of the salvage process – regardless of scale or complexity, as demonstrated in projects such as the recovery of the Temeraire.

Project Overview

Indianic Group was engaged to recover the historic vessel Temeraire, a 1931 wooden powerboat that had submerged in its pen at Emu Point, Albany, Western Australia.

The vessel, a 94-year-old kauri carvel-planked ferry, is one of the original Rottnest Island ferries and holds not only significant heritage value, but also sentimental value for many people in Western Australia. The owner had been in the process of restoring the vessel before it was discovered to have sunk in its pen in October 2025.

Services Provided

  • Marine Salvage and Recovery Operations
  • Emergency Mobilisation and Logistics
  • Specialist Lift and Recovery Planning

The Challenge

The recovery presented several complexities due to the vessel’s age, fragile timber construction, and heritage significance. The kauri planking required careful handling to avoid further structural damage during lifting operations. Additionally, the vessel’s submerged condition in a confined pen environment limited access and required precision planning to safely execute the recovery. Environmental considerations and minimising disturbance within the marina were also key priorities.

The Solution

Indianic mobilised immediately from Henderson to Albany with salvage equipment capable of safely recovering the vessel. The salvage team implemented a controlled and methodical recovery plan, including careful rigging, load distribution, and lift sequencing to protect the integrity of the hull. Throughout the operation, a strong emphasis was placed on minimising additional damage and ensuring a safe and efficient recovery process.

Outcome / Result

The successful recovery of Temeraire was achieved without further damage to the vessel, preserving its structural integrity and historical value. The operation enabled the owner to resume the restoration of this iconic vessel, ensuring its legacy can be maintained for future generations. Indianic’s rapid response, technical capability, and attention to detail were critical to delivering a positive outcome on this high-risk, heritage-sensitive project.