RTIO – MCD: Channel Marker Recovery and Installation

Indianic were contracted by MacDonnell Dowell to remove 9 channel markers, from the Cape Lambert access channel.  The removed markers had a gross weight 30t, these were dismantled and the clump weights were recovered. They were replaced with 90t markers with a box clump weight configuration.

Indianic provided DSV, support vessels and a containerised Air Diving spread for the jack up barge. This was supported with a hyperbaric support system on shore, with a containerised Decompression Chamber. Indianic provided multi skilled and certified personal, who worked as riggers and vessel operators, while also as a 7 man dive team as required. This proved to be a very cost effective option for the client.

 